| BldgNo |
BldgName |
CHE Condition Code |
Capital Renewal Estimate |
| 1 | Taylor Education Bldg | Remodel-C. Rest Cost >50% Repl Cost | $866,931 |
| 2 | Scott Street Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | $226,840 |
| 3 | Research Facility #1 | Not maintained by PPD | |
| 4 | Central Heating Plant #2 | Remodel-C. Rest Cost >50% Repl Cost | $8,171,280 |
| 5 | Frank D. Peterson Service Bldg | Remodel-C. Rest Cost >50% Repl Cost | $3,305,008 |
| 6 | Holmes Hall | Not maintained by PPD | |
| 7 | Jewell Hall | Not maintained by PPD | |
| 8 | Boyd Hall | Not maintained by PPD | |
| 9 | Patterson Hall | Not maintained by PPD | |
| 10 | Hamilton House | Not maintained by PPD | |
| 11 | Keeneland Hall | Not maintained by PPD | |
| 12 | Blazer Hall | Not maintained by PPD | |
| 13 | KGS Core Library | Not maintained by PPD | |
| 14 | Boone Faculty Center | Not maintained by PPD | |
| 15 | William B. Sturgill Development Bldg | Satisfactory. Normal Maintenance | $127,250 |
| 16 | Parking Booth Kentucky Clinic | Not maintained by PPD | |
| 17 | Dickey Hall | Remodel-C. Rest Cost >50% Repl Cost | $5,723,244 |
| 18 | Faculty Club Parking Booth | Not maintained by PPD | |
| 19 | Memorial Coliseum | Not maintained by PPD | |
| 20 | Engineering Transportation Research Garage | Remodel-B. Rest Cost 26-50% Repl Cost | |
| 21 | Old Engineers Residence | Remodel-A. Rest Cost 1-25% Repl Cost | $58,850 |
| 22 | Fine Arts Guignol Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | $6,698,543 |
| 23 | Safety & Security | Remodel-C. Rest Cost >50% Repl Cost | $491,620 |
| 24 | Lafferty Hall | Remodel-A. Rest Cost 1-25% Repl Cost | $998,791 |
| 25 | White Hall Classroom Bldg | Remodel-B. Rest Cost 26-50% Repl Cost | $1,436,630 |
| 26 | Student Center Addition | Not maintained by PPD | |
| 27 | Patterson Office Tower | Remodel-A. Rest Cost 1-25% Repl Cost | $2,531,740 |
| 28 | Barker Hall | Remodel-C. Rest Cost >50% Repl Cost | $5,529,290 |
| 29 | Alumni Gym | Remodel-B. Rest Cost 26-50% Repl Cost | $4,353,592 |
| 30 | Student Center | Not maintained by PPD | |
| 31 | Frazee Hall | Remodel-A. Rest Cost 1-25% Repl Cost | $2,043,620 |
| 32 | Main Building | Satisfactory. Normal Maintenance | |
| 33 | Ezra Gillis Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | $51,360 |
| 34 | Carol Martin Gatton Business & Economics Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | $590,850 |
| 35 | Miller Hall | Remodel-A. Rest Cost 1-25% Repl Cost | $143,400 |
| 38 | Engineering Annex | Remodel-A. Rest Cost 1-25% Repl Cost | $93,540 |
| 39 | Margaret I. King Library | Remodel-A. Rest Cost 1-25% Repl Cost | $11,020,994 |
| 40 | Maxwell Place | Satisfactory. Normal Maintenance | |
| 41 | Pence Hall | Remodel-A. Rest Cost 1-25% Repl Cost | $3,044,801 |
| 42 | Grehan Journalism Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | $916,020 |
| 43 | S. J. Sam Whalen Bldg | Remodel-B. Rest Cost 26-50% Repl Cost | $3,369,331 |
| 44 | Kastle Hall | Remodel-A. Rest Cost 1-25% Repl Cost | $4,657,590 |
| 45 | McVey Hall | Remodel-A. Rest Cost 1-25% Repl Cost | $4,606,930 |
| 46 | Anderson Hall Tower | Remodel-C. Rest Cost >50% Repl Cost | $1,674,160 |
| 47 | C. W. Mathews Bldg | Remodel-C. Rest Cost >50% Repl Cost | $2,257,370 |
| 48 | Law Building | Remodel-B. Rest Cost 26-50% Repl Cost | $3,709,665 |
| 49 | Memorial Hall | Remodel-B. Rest Cost 26-50% Repl Cost | $1,494,900 |
| 50 | Erikson Hall | Remodel-A. Rest Cost 1-25% Repl Cost | $1,564,350 |
| 51 | Mineral Industries Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | $1,247,000 |
| 52 | Terrel Civil Engineering Bldg | Remodel-B. Rest Cost 26-50% Repl Cost | $1,379,717 |
| 53 | Slone Research Bldg | Remodel-C. Rest Cost >50% Repl Cost | $3,425,340 |
| 54 | Funkhouser Bldg | Remodel-C. Rest Cost >50% Repl Cost | $4,340,612 |
| 55 | Chemistry-Physics Building | Remodel-C. Rest Cost >50% Repl Cost | $3,960,443 |
| 56 | Breckinridge Hall | Remodel-C. Rest Cost >50% Repl Cost | $691,340 |
| 57 | Kinkead Hall | Remodel-B. Rest Cost 26-50% Repl Cost | $732,400 |
| 58 | Bradley Hall | Remodel-C. Rest Cost >50% Repl Cost | $782,360 |
| 59 | Bowman Hall | Remodel-C. Rest Cost >50% Repl Cost | $791,237 |
| 60 | Nursery | Remodel-B. Rest Cost 26-50% Repl Cost | $139,920 |
| 61 | Tobacco Research Laboratory | Remodel-B. Rest Cost 26-50% Repl Cost | $572,420 |
| 62 | Insectary and Conservatory | Remodel-B. Rest Cost 26-50% Repl Cost | $439,790 |
| 63 | Shed By Ecological Research | Not maintained by PPD | |
| 64 | Scovell Hall | Remodel-B. Rest Cost 26-50% Repl Cost | $5,013,613 |
| 65 | Small Animal Lab | Satisfactory. Normal Maintenance | $59,400 |
| 66 | Agronomy Head House and Greenhouses 1 & 2 | Remodel-A. Rest Cost 1-25% Repl Cost | $389,266 |
| 67 | Chi Omega Sorority | Not maintained by PPD | |
| 68 | Delta Delta Delta Sorority | Not maintained by PPD | |
| 69 | Alpha Delta Pi Sorority | Not maintained by PPD | |
| 70 | Wenner-Gren Research Lab | Not maintained by PPD | |
| 71 | Food Storage K-Lair Grill | Not maintained by PPD | |
| 72 | Donovan Hall | Not maintained by PPD | |
| 73 | Thomas Poe Cooper Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | $3,640,148 |
| 75 | Kelley Building | Not maintained by PPD | |
| 76 | Dimock Animal Pathology | Remodel-A. Rest Cost 1-25% Repl Cost | $3,273,826 |
| 78 | Med Center Annex #5 | Not maintained by PPD | |
| 82 | College of Pharmacy | Not maintained by PPD | |
| 85 | Medical Center Heating and Cooling Plant | Remodel-C. Rest Cost >50% Repl Cost | $3,723,390 |
| 86 | College of Medicine Office Bldg | Not maintained by PPD | |
| 87 | Medical Center Storage Facility | Not maintained by PPD | |
| 88 | Agriculture Motor Pool | Not maintained by PPD | |
| 89 | Cooling Plant #1 | Remodel-C. Rest Cost >50% Repl Cost | |
| 91 | Agriculture Science Center North | Remodel-A. Rest Cost 1-25% Repl Cost | $5,752,320 |
| 92 | Seed House | Remodel-A. Rest Cost 1-25% Repl Cost | $952,293 |
| 93 | Ben Roach Cancer Bldg | Not maintained by PPD | |
| 94 | Cooper House | Remodel-B. Rest Cost 26-50% Repl Cost | $69,550 |
| 96 | Combs Cancer Research Center | Not maintained by PPD | |
| 97 | E. S. Good Barn | Satisfactory. Normal Maintenance | |
| 98 | Marylou Whitney and John Hendrickson Cancer Facility for Women | Not maintained by PPD | |
| 99 | Gluck Equine Research Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | $307,090 |
| 101 | Reynolds Warehouse #1 | Remodel-A. Rest Cost 1-25% Repl Cost | $1,337,406 |
| 102 | Reynolds Warehouse #2 | Remodel-C. Rest Cost >50% Repl Cost | $214,000 |
| 103 | Reynolds Warehouse #3 | Remodel-A. Rest Cost 1-25% Repl Cost | $202,650 |
| 105 | Commonwealth Village #2 | Not maintained by PPD | |
| 106 | Commonwealth Village #1 | Not maintained by PPD | |
| 107 | Mining & Minerals Research Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | $331,600 |
| 108 | Center for Robotics & Manufacturing Systems | Remodel-A. Rest Cost 1-25% Repl Cost | $58,850 |
| 110 | Maintenance Bldg (Athletics) | Not maintained by PPD | |
| 111 | Haggin Hall | Not maintained by PPD | |
| 112 | Alpha Tau Omega Fraternity | Not maintained by PPD | |
| 113 | Shively Sports Center | Not maintained by PPD | |
| 114 | Track Storage Bldg | Not maintained by PPD | |
| 115 | Alpha Gamma Rho Fraternity | Not maintained by PPD | |
| 118 | Fraternity House Storage | Not maintained by PPD | |
| 119 | Helen King Alumni Building | Remodel-B. Rest Cost 26-50% Repl Cost | $38,400 |
| 121 | Sigma Nu Fraternity | Not maintained by PPD | |
| 122 | Delta Gamma Sorority | Not maintained by PPD | |
| 124 | Delta Zeta Sorority | Not maintained by PPD | |
| 125 | Kappa Alpha Theta Sorority | Not maintained by PPD | |
| 126 | Phi Delta Theta Fraternity | Not maintained by PPD | |
| 127 | Alpha Gamma Delta Sorority | Not maintained by PPD | |
| 128 | Kappa Delta Sorority | Not maintained by PPD | |
| 129 | Sigma Kappa Sorority | Not maintained by PPD | |
| 130 | Cooperstown Bldg A | Not maintained by PPD | |
| 131 | Cooperstown Bldg B | Not maintained by PPD | |
| 132 | Cooperstown Bldg C | Not maintained by PPD | |
| 133 | Cooperstown Bldg D | Not maintained by PPD | |
| 134 | Cooperstown Bldg E | Not maintained by PPD | |
| 135 | Cooperstown Bldg F | Not maintained by PPD | |
| 136 | Cooperstown Bldg G | Not maintained by PPD | |
| 137 | Lambda Chi Alpha Fraternity | Not maintained by PPD | |
| 138 | Phi Sigma Kappa Fraternity | Not maintained by PPD | |
| 140 | Kappa Sigma Fraternity | Not maintained by PPD | |
| 142 | Farmhouse Fraternity | Not maintained by PPD | |
| 143 | Blanding II | Not maintained by PPD | |
| 144 | Blanding III | Not maintained by PPD | |
| 145 | Blanding Tower | Not maintained by PPD | |
| 146 | Blanding IV | Not maintained by PPD | |
| 147 | Complex Commons | Not maintained by PPD | |
| 148 | Kirwan IV | Not maintained by PPD | |
| 149 | Kirwan Tower | Not maintained by PPD | |
| 150 | Kirwan III | Not maintained by PPD | |
| 151 | Kirwan II | Not maintained by PPD | |
| 152 | Kirwan I | Not maintained by PPD | |
| 153 | Blanding I | Not maintained by PPD | |
| 154 | Head House | Remodel-A. Rest Cost 1-25% Repl Cost | $322,025 |
| 155 | Greenhouse No 2 | Satisfactory. Normal Maintenance | $64,735 |
| 156 | Greenhouse No 4 | Satisfactory. Normal Maintenance | |
| 157 | Greenhouse No 7 | Satisfactory. Normal Maintenance | |
| 158 | Greenhouse No 5 | Satisfactory. Normal Maintenance | |
| 159 | Greenhouse No 3 | Satisfactory. Normal Maintenance | |
| 160 | Greenhouse No 1 | Satisfactory. Normal Maintenance | |
| 161 | Greenhouse No 9 | Satisfactory. Normal Maintenance | |
| 162 | Greenhouse No 11 | Satisfactory. Normal Maintenance | |
| 163 | Greenhouse No 6 | Satisfactory. Normal Maintenance | $64,200 |
| 164 | Greenhouse No 12 | Satisfactory. Normal Maintenance | |
| 166 | Guardhouse Administration Drive | Satisfactory. Normal Maintenance | |
| 167 | Guardhouse Funkhouser | Not maintained by PPD | |
| 170 | Guardhouse Student Center | Not maintained by PPD | |
| 171 | Guardhouse College View | Not maintained by PPD | |
| 173 | Guardhouse Med Plaza | Not maintained by PPD | |
| 175 | Guardhouse Med Plaza | Not maintained by PPD | |
| 176 | Guardhouse Ky Clinic | Not maintained by PPD | |
| 177 | Residence Motor Pool | Not maintained by PPD | |
| 182 | Isolation Barn Incinerator | Not maintained by PPD | |
| 183 | Isolation Barn | Not maintained by PPD | |
| 184 | Agricultural Machine Research Lab | Not maintained by PPD | |
| 185 | Garage by Motor Pool Residence | Not maintained by PPD | |
| 187 | Bus Shelter #5 | Not maintained by PPD | |
| 189 | Shawneetown Bldg A | Not maintained by PPD | |
| 190 | Shawneetown Bldg B | Not maintained by PPD | |
| 191 | Shawneetown Bldg D | Not maintained by PPD | |
| 192 | Shawneetown Bldg F | Not maintained by PPD | |
| 193 | Shawneetown Bldg E | Not maintained by PPD | |
| 194 | Shawneetown Bldg C | Not maintained by PPD | |
| 197 | Parking Garage No 1 | Remodel-C. Rest Cost >50% Repl Cost | $216,630 |
| 198 | Parking Garage No 2 | Remodel-C. Rest Cost >50% Repl Cost | $250,000 |
| 199 | Parking Garage No 3 | Not maintained by PPD | |
| 200 | Wethington Allied Health Building | Not maintained by PPD | |
| 202 | Parking Garage No 5 | Satisfactory. Normal Maintenance | $16,000 |
| 204 | Cooling Plant #2 | Remodel-A. Rest Cost 1-25% Repl Cost | $10,088,000 |
| 207 | Arts Metal Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | $72,760 |
| 209 | Centrifuge Building | Not maintained by PPD | |
| 210 | Reynolds Warehouse #4 | Satisfactory. Normal Maintenance | |
| 211 | Maxwell Place Garage | Satisfactory. Normal Maintenance | |
| 212 | Lancaster Aquatics | Remodel-B. Rest Cost 26-50% Repl Cost | $192,762 |
| 213 | Boone Tennis Center | Not maintained by PPD | |
| 214 | Flammable Storage Bldg | Satisfactory. Normal Maintenance | |
| 215 | W. P. Garrigus Bldg | Remodel-B. Rest Cost 26-50% Repl Cost | $1,942,659 |
| 216 | Multi-Disciplinary Research Lab No 3 | Remodel-A. Rest Cost 1-25% Repl Cost | $1,027,740 |
| 217 | Electrical Substation #2 | Not maintained by PPD | |
| 219 | Seaton Center | Remodel-B. Rest Cost 26-50% Repl Cost | $434,375 |
| 222 | Commonwealth Stadium | Not maintained by PPD | |
| 223 | Warren Wright Medical Plaza | Not maintained by PPD | |
| 224 | Lucille Caudill Little Fine Arts Library | Remodel-B. Rest Cost 26-50% Repl Cost | $483,090 |
| 225 | T H Morgan Biological Sciences | Remodel-B. Rest Cost 26-50% Repl Cost | $502,520 |
| 227 | Recreation Equipment Storage Bldg | Satisfactory. Normal Maintenance | |
| 229 | Agricultural Distribution Center | Not maintained by PPD | |
| 230 | Sanders-Brown Gerontology Center | Not maintained by PPD | |
| 231 | Farm Maintenance Storage Shed | Not maintained by PPD | |
| 232 | Nursing Learning Center | Not maintained by PPD | |
| 235 | John W Oswald Bldg | Not maintained by PPD | |
| 236 | Kentucky Tobacco Research and Development Center | Not maintained by PPD | |
| 237 | Wenner-Gren Research Addition | Not maintained by PPD | |
| 238 | 404 Linden Walk | Not maintained by PPD | |
| 240 | 468 Rose Lane | Not maintained by PPD | |
| 241 | Singletary Center for the Arts | Remodel-C. Rest Cost >50% Repl Cost | $1,306,550 |
| 242 | Joe B. Hall Wildcat Lodge | Not maintained by PPD | |
| 243 | Greg Page Apartments 1 | Not maintained by PPD | |
| 244 | Greg Page Apartments 2 | Not maintained by PPD | |
| 245 | Greg Page Apartments 3 | Not maintained by PPD | |
| 246 | Greg Page Apartments 4 | Not maintained by PPD | |
| 247 | Greg Page Apartments 5 | Not maintained by PPD | |
| 248 | Greg Page Apartments 6 | Not maintained by PPD | |
| 249 | Greg Page Apartments 7 | Not maintained by PPD | |
| 250 | Greg Page Apartments 8 | Not maintained by PPD | |
| 251 | Greg Page Apartments 9 | Not maintained by PPD | |
| 252 | Greg Page Apartments 10 | Not maintained by PPD | |
| 253 | Greg Page Apartments 11 | Not maintained by PPD | |
| 254 | Greg Page Apartments 12 | Not maintained by PPD | |
| 255 | Greg Page Apartments 13 | Not maintained by PPD | |
| 256 | Greg Page Apartments 14 | Not maintained by PPD | |
| 257 | Greg Page Apartments 15 | Not maintained by PPD | |
| 258 | Greg Page Apartments 16 | Not maintained by PPD | |
| 259 | Greg Page Apartments 17 | Not maintained by PPD | |
| 260 | Greg Page Apartments 18 | Not maintained by PPD | |
| 261 | Greg Page Apartments 19 | Not maintained by PPD | |
| 262 | Greg Page Apartments 20 | Not maintained by PPD | |
| 263 | Greg Page Apartments 21 | Not maintained by PPD | |
| 264 | Greg Page Apartments 22 | Not maintained by PPD | |
| 265 | Greg Page Apartments 23 | Not maintained by PPD | |
| 266 | Greg Page Apartments 24 | Not maintained by PPD | |
| 267 | Greg Page Apartments 25 | Not maintained by PPD | |
| 268 | Greg Page Food Storage Laundry | Not maintained by PPD | |
| 269 | Communications Building | Not maintained by PPD | |
| 272 | Information Building | Not maintained by PPD | |
| 274 | Moloney Building | Not maintained by PPD | |
| 275 | Bruce Poundstone Regulatory Services Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | |
| 276 | Charles E. Barnhart Building | Remodel-B. Rest Cost 26-50% Repl Cost | $558,960 |
| 277 | Nutter Football Training Facility | Not maintained by PPD | |
| 278 | PPD Storage Bldg | Satisfactory. Normal Maintenance | |
| 279 | BIRP Building | Satisfactory. Normal Maintenance | |
| 280 | Buena Vista Transmitter | Not maintained by PPD | |
| 281 | Oliver H. Raymond Civil Engineering | Remodel-A. Rest Cost 1-25% Repl Cost | $31,050 |
| 282 | Gas Storage Building | Not maintained by PPD | |
| 283 | Hagan Baseball Stadium | Not maintained by PPD | |
| 284 | Kentucky Clinic | Not maintained by PPD | |
| 285 | Nutter Field House | Not maintained by PPD | |
| 286 | A.S.T.E.C.C. | Remodel-A. Rest Cost 1-25% Repl Cost | $278,850 |
| 287 | Electric HVAC Bldg | Not maintained by PPD | |
| 288 | PPD Greenhouse | Satisfactory. Normal Maintenance | |
| 289 | Hazardous Waste Storage | Not maintained by PPD | |
| 293 | UK Chandler Hospital | Not maintained by PPD | |
| 297 | Dental Science Bldg | Not maintained by PPD | |
| 298 | William R. Willard Medical Education Bldg | Not maintained by PPD | |
| 300 | Arboretum Tool Shed | Not maintained by PPD | |
| 301 | 154 Bonnie Brae | Not maintained by PPD | |
| 302 | Dorotha Oatts Smith Visitor Center | Satisfactory. Normal Maintenance | |
| 305 | Peter P. Bosomworth Health Sciences Research Bldg | Not maintained by PPD | |
| 308 | Hospital Smoking Shelter | Not maintained by PPD | |
| 312 | Plant Sciences | Satisfactory. Normal Maintenance | |
| 314 | 252 East Maxwell St | Satisfactory. Normal Maintenance | $311,770 |
| 315 | 206 East Maxwell St | Remodel-B. Rest Cost 26-50% Repl Cost | $255,710 |
| 322 | 417 Columbia Avenue | Remodel-A. Rest Cost 1-25% Repl Cost | |
| 333 | 641 South Limestone St | Remodel-B. Rest Cost 26-50% Repl Cost | $148,935 |
| 336 | Thomas D Clark Bldg | Satisfactory. Normal Maintenance | $20,000 |
| 337 | 663 South Limestone Garage | Satisfactory. Normal Maintenance | |
| 343 | Bingham Davis House | Remodel-A. Rest Cost 1-25% Repl Cost | $70,000 |
| 344 | Gaines Center for the Humanities | Remodel-A. Rest Cost 1-25% Repl Cost | $32,000 |
| 345 | Max Kade German House | Not maintained by PPD | |
| 346 | 654 Maxwelton Ct | Not maintained by PPD | |
| 347 | 624 Maxwelton Ct | Satisfactory. Normal Maintenance | $128,850 |
| 348 | 626 Maxwelton Ct | Not maintained by PPD | |
| 349 | 641 Maxwelton Ct | Remodel-A. Rest Cost 1-25% Repl Cost | $68,850 |
| 350 | 643 Maxwelton Ct | Remodel-A. Rest Cost 1-25% Repl Cost | $105,850 |
| 351 | 644 Maxwelton Ct | Remodel-A. Rest Cost 1-25% Repl Cost | $155,850 |
| 353 | 520 Oldham Ct | Not maintained by PPD | |
| 361 | 402 Pennsylvania Ct | Not maintained by PPD | |
| 362 | 405 Pennsylvania Ct | Not maintained by PPD | |
| 363 | 406 Pennsylvania Ct | Not maintained by PPD | |
| 365 | 410 Pennsylvania Ct | Not maintained by PPD | |
| 377 | 319 Rose Lane | Not maintained by PPD | |
| 378 | 321 Rose Lane | Not maintained by PPD | |
| 381 | 162-164 Gazette Avenue | Not maintained by PPD | |
| 386 | 150 Gazette Avenue | Not maintained by PPD | |
| 390 | Bus Shelter #1 | Not maintained by PPD | |
| 391 | Bus Shelter #2 | Not maintained by PPD | |
| 392 | Bus Shelter #3 | Not maintained by PPD | |
| 394 | Bus Shelter #6
| Not maintained by PPD | |
| 396 | Bus Shelter #8 | Not maintained by PPD | |
| 397 | Bus Shelter #9 | Not maintained by PPD | |
| 398 | Bus Shelter #10 | Not maintained by PPD | |
| 399 | Bus Shelter #11 | Not maintained by PPD | |
| 400 | Ellen H. Richards House | Satisfactory. Normal Maintenance | |
| 401 | Weldon House | Not maintained by PPD | |
| 402 | 147 Washington Ave | Remodel-B. Rest Cost 26-50% Repl Cost | $274,990 |
| 412 | 403 Pennsylvania Ct | Not maintained by PPD | |
| 413 | Softball/Soccer Locker Rooms | Not maintained by PPD | |
| 416 | Bus Shelter #12 | Not maintained by PPD | |
| 417 | 660 South Limestone | Satisfactory. Normal Maintenance | $4,000 |
| 418 | Bus Shelter #4 | Not maintained by PPD | |
| 419 | Bus Shelter #13 | Not maintained by PPD | |
| 420 | 424 Euclid Avenue | Satisfactory. Normal Maintenance | |
| 428 | 457 Woodland Ave | Not maintained by PPD | |
| 432 | Commonwealth House | Satisfactory. Normal Maintenance | |
| 433 | 412-414 Rose Street | Satisfactory. Normal Maintenance | |
| 442 | Ligon House | Satisfactory. Normal Maintenance | |
| 449 | Shively Grounds Storage Bldg | Not maintained by PPD | |
| 450 | Softball Maintenance Bldg | Not maintained by PPD | |
| 451 | Soccer Field Pressbox | Not maintained by PPD | |
| 452 | Softball Pressbox | Not maintained by PPD | |
| 453 | Shively Grounds Bldg | Not maintained by PPD | |
| 456 | W.T. Young Library | Remodel-A. Rest Cost 1-25% Repl Cost | $864,000 |
| 460 | 149 Transcript Ave | Not maintained by PPD | |
| 461 | 153 Transcript Ave | Not maintained by PPD | |
| 467 | 220 Transcript Ave | Not maintained by PPD | |
| 473 | 505 Oldham Ct | Not maintained by PPD | |
| 481 | Academic Tech Building | Not maintained by PPD | |
| 482 | 408 Linden Walk | Satisfactory. Normal Maintenance | $29,000 |
| 487 | 518 Oldham Ct | Not maintained by PPD | |
| 489 | 1117 South Limestone | Not maintained by PPD | |
| 490 | Environmental Quality Management | Satisfactory. Normal Maintenance | $25,000 |
| 491 | Ecological Research Facility | Satisfactory. Normal Maintenance | $80,000 |
| 494 | Stuckert Career Center | Satisfactory. Normal Maintenance | |
| 495 | James F. Hardymon Communications Bldg | Satisfactory. Normal Maintenance | |
| 496 | Japanese Saturday School Unit 3 | Not maintained by PPD | |
| 498 | Japanese Saturday School Office | Not maintained by PPD | |
| 499 | Japanese Saturday School Classroom | Not maintained by PPD | |
| 503 | Ralph G Anderson Building | Satisfactory. Normal Maintenance | |
| 504 | Sigma Chi House | Not maintained by PPD | |
| 505 | New Sigma Phi Epsilon House | Not maintained by PPD | |
| 506 | Robert Straus Behavioral Research Building | Satisfactory. Normal Maintenance | |
| 507 | Sigma Alpha Epsilon Fraternity | Not maintained by PPD | |
| 510 | 456 Rose Lane | Not maintained by PPD | |
| 511 | 456 Rose Lane Garage | Not maintained by PPD | |
| 3116 | Apartment Garage | Remodel-B. Rest Cost 26-50% Repl Cost | $130,540 |
| 3118 | Carnahan House | Remodel-A. Rest Cost 1-25% Repl Cost | $449,400 |
| 3351 | Vacant Dog Kennel | Satisfactory. Normal Maintenance | |
| 3352 | Vacant Dog Kennel | Satisfactory. Normal Maintenance | |
| 3353 | Grounds Office | Satisfactory. Normal Maintenance | |
| 3354 | Tennis Pro Shop | Satisfactory. Normal Maintenance | |
| 3355 | Tennis Pro Shop | Remodel-A. Rest Cost 1-25% Repl Cost | |
| 3357 | Garage Apartments | Remodel-A. Rest Cost 1-25% Repl Cost | $223,580 |
| 3358 | Mansion | Remodel-A. Rest Cost 1-25% Repl Cost | $5,121,185 |
| 3359 | Dressing Rooms | Remodel-A. Rest Cost 1-25% Repl Cost | |
| 3360 | Recreation Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | $270,710 |
| 3361 | Pleasure Barn | Remodel-A. Rest Cost 1-25% Repl Cost | $80,250 |
| 3363 | Storage Bldg | Remodel-A. Rest Cost 1-25% Repl Cost | |
| 3369 | Pump House | Satisfactory. Normal Maintenance | |
| 3372 | Bath House | Satisfactory. Normal Maintenance | |